East West Gas Pipeline

As a Sub-Contractor for Reliance Industries Ltd.(RIL) we are laying a 48" dia Gas pipeline for the first time in India for an overall length of 80Kms in the Krishna- Godavari basin.

  • ROU Clearance
  • Stringing
  • Welding
  • Joint Coating
  • Trenching
  • Aiding in Lowering
  • HDPE Duct Laying
  • Back Filling
  • Restoration

Southern & Northern Railways

Construction of Dayabasti Grade Separator, which includes earthwork, blanketing, retaining walls, PSC girders, bridges, RUBs (Road Under Bridges), and residential quarters, all part of the Dayabasti-Azadpur section.

Construction of two Road Under Bridges (RUBs) using the box pushing technique, comprising two RCC (Reinforced Cement Concrete) boxes with internal dimensions of 9.25x5.35 meters each and one RCC drainage box of 2.0x2.0 meters.

GMR Energy Limited

GMR Energy Limited successfully completed site grading works for the Barge location project at Kakinada port site from 15th May 2008 to 15th October 2008. The work was completed ahead of the scheduled deadline, showcasing efficiency and dedication to project timelines.

Gangavaram Port

Material Handling & Stevedoring Services

The work involves providing comprehensive logistical support at Gangavaram Port, including vessel handling, stacking materials at the designated railway siding, and loading them into wagons as per instructions from GPL. It also includes deploying sufficient manpower to oversee loading, transportation, wagon loading operations, and shifting cargo to the railway siding.

Storm Water Drainage Project under UIDSSMT Scheme - Machilipatnam Municipality

This project aims to create a comprehensive stormwater drainage network connecting street and sub-drains to major drains, directing water to an outfall drain flowing into the sea.

It includes:

15 Major Drains: 26.8 km (sizes from 1.1 x 0.8 m to 4.2 x 4.1 m)

Rehabilitation of 3 Major Existing Drains: 2.84 km

Total Drain Network: 448 km, comprising

  • 225mm Drains: 175 km
  • 300mm Drains: 103 km
  • 380mm Drains: 65 km
  • 450mm Drains: 46 km
  • 600mm Drains: 29 km

To enhance drainage efficiency, five pumping stations will be installed on major drains. The project is set for completion within 24 months.

Projects In The Papeline

Marlin Projects is engaged in a variety of upcoming ventures, from renewable energy to infrastructure development. Our focus is on delivering high-quality projects on time, ensuring excellence in every sector we operate.

Project Location Duration Value
Maatha Project LLP Bhagewadi 2 years ₹25 Crores
Sri Vaishnavi Global Avenues & Infra Solutions Pvt. Ltd. Jharkhand 2 years ₹31 Crores
GHMC Hyderabad Hyderabad 3 years ₹7 Crores
Hi-Tech Pharmaceuticals Pvt. Ltd. Hyderabad 2 years ₹3 Crores
Megha Engineering & Infrastructures Ltd. Multiple Locations 2 years ₹22 Crores
Hotcrete Infrastructures Pvt. Ltd. Multiple Locations 2 years ₹4 Crores
Kirlampudi Sugar Mills Ltd. Pithapuram Estimated ₹160 Crores
Nanakramguda Hyderabad Estimated ₹150 Crores
Sri Vaishnavi Global Avenues & Infra Solutions Pvt. Ltd. Amaravati, Andhra Pradesh Estimated ₹45 Crores
Haridwar Infrastructures Ltd. Hitex, Hyderabad & Amaravati Estimated ₹45 Crores