As a Sub-Contractor for Reliance Industries Ltd.(RIL) we are laying a 48" dia Gas pipeline for the first time in India for an overall length of 80Kms in the Krishna- Godavari basin.
Construction of Dayabasti Grade Separator, which includes earthwork, blanketing, retaining walls, PSC girders, bridges, RUBs (Road Under Bridges), and residential quarters, all part of the Dayabasti-Azadpur section.
Construction of two Road Under Bridges (RUBs) using the box pushing technique, comprising two RCC (Reinforced Cement Concrete) boxes with internal dimensions of 9.25x5.35 meters each and one RCC drainage box of 2.0x2.0 meters.
GMR Energy Limited successfully completed site grading works for the Barge location project at Kakinada port site from 15th May 2008 to 15th October 2008. The work was completed ahead of the scheduled deadline, showcasing efficiency and dedication to project timelines.
Material Handling & Stevedoring Services
The work involves providing comprehensive logistical support at Gangavaram Port, including vessel handling, stacking materials at the designated railway siding, and loading them into wagons as per instructions from GPL. It also includes deploying sufficient manpower to oversee loading, transportation, wagon loading operations, and shifting cargo to the railway siding.
This project aims to create a comprehensive stormwater drainage network connecting street and sub-drains to major drains, directing water to an outfall drain flowing into the sea.
It includes:
15 Major Drains: 26.8 km (sizes from 1.1 x 0.8 m to 4.2 x 4.1 m)
Rehabilitation of 3 Major Existing Drains: 2.84 km
Total Drain Network: 448 km, comprising
To enhance drainage efficiency, five pumping stations will be installed on major drains. The project is set for completion within 24 months.
Marlin Projects is engaged in a variety of upcoming ventures, from renewable energy to infrastructure development. Our focus is on delivering high-quality projects on time, ensuring excellence in every sector we operate.
Project | Location | Duration | Value |
---|---|---|---|
Maatha Project LLP | Bhagewadi | 2 years | ₹25 Crores |
Sri Vaishnavi Global Avenues & Infra Solutions Pvt. Ltd. | Jharkhand | 2 years | ₹31 Crores |
GHMC Hyderabad | Hyderabad | 3 years | ₹7 Crores |
Hi-Tech Pharmaceuticals Pvt. Ltd. | Hyderabad | 2 years | ₹3 Crores |
Megha Engineering & Infrastructures Ltd. | Multiple Locations | 2 years | ₹22 Crores |
Hotcrete Infrastructures Pvt. Ltd. | Multiple Locations | 2 years | ₹4 Crores |
Kirlampudi Sugar Mills Ltd. | Pithapuram | Estimated | ₹160 Crores |
Nanakramguda | Hyderabad | Estimated | ₹150 Crores |
Sri Vaishnavi Global Avenues & Infra Solutions Pvt. Ltd. | Amaravati, Andhra Pradesh | Estimated | ₹45 Crores |
Haridwar Infrastructures Ltd. | Hitex, Hyderabad & Amaravati | Estimated | ₹45 Crores |